Projects

‘The Serpentine’

‘The Serpentine’

With a name like ‘The Serpentine’, it’s no wonder that this snaking housing project called for a flexible roofing solution! The £11.6 million regeneration scheme in Aylesbury saw a former Territorial Army site transformed into an affordable and sustainable housing development, comprising 94 terraced houses and apartment blocks forming a continuous curved building. After the existing army building was demolished, a timber-frame structure was erected to form the development’s unusual snaking shape. Accurate Roofing were tasked with challenge of installing the roof element, with Sika Sarnafil single ply specified for its flexibility and suitability to tricky...

Read More

Apple Head Office London

Apple Head Office London

Accurate Roofing successfully tendered and won the re-roofing at the London offices of the computer software company apple. The project consisted of a complete re-roof using a Bauder Thermofoil Single ply system. The whole operation was carried out successfully renewing the roof system whilst not disturbing the day to day running of Apple. The project was completed on time, within budget and quality controlled/managed, using the skills and training of our employees, to produce a product and finish of the highest standard. Accurate Roofing was pleased to add the software company Apple to its growing list of very satisfied, ‘Blue Chip’...

Read More

Chelsea Football Club Training Facility Cobham Surrey

Chelsea Football Club Training Facility Cobham Surrey

Accurate Roofing successfully tendered this fantastic looking scheme at the new training facility for one the world’s best known football clubs. The sloping curved roof incorporates a ‘Bauder Green Roof’ insulated specification, which by design, visually impresses the observer, whilst at the same time blends the building into its rural landscape. The finish of the roof mirrored the overall quality of the building (as can be seen from the images). Accurate Roofing again received a large number of accolades from respected bodies within our industry. This was another project completed to cost and programme which was won with a competitive...

Read More

Coca Cola Factory Sidcup Kent

Coca Cola Factory Sidcup Kent

Initially called in due to our location in relation to the project, Accurate Roofing successfully tendered the re roofing of one the huge warehouse buildings at Coca Cola’s main plant in Kent. The project brief was to remove the existing asbestos sheeting and successfully dispose of the material before installing a new profiled sheet cladding system to match the adjacent warehouse. The whole roof system was taken off in sections, removed and replaced within budget and to programme, whilst normal operations continued below. The 3,500 sq M roof was completed in less than 6 weeks. Valuing our customers as we do, Accurate Roofing was pleased to add Coco Cola to its growing...

Read More

Frant Primary School Tunbridge Kent

Frant Primary School Tunbridge Kent

A very interesting scheme secured by Accurate and again successfully tendered against all of its main rivals. The project involved a structurally insulated deck construction which is erected on site having been brought in from Europe. The main Contractors brief was to provide an ‘Eco friendly’ building from ground to roof. The above construction was waterproofed with Bauder’s Thermoplan ‘T’ FPO single ply membrane which was mechanically fixed into the structural deck panel. The main areas were then covered with Bauder’s XF301 sedum blanket carefully retained on the 15 degree roof slope by a series of gripper rods which were fixed onto the membrane without...

Read More

Grand Designs For Chanel 4 Television

Grand Designs For Chanel 4 Television

Accurate Roofing was approached by home owner and self build ‘Project Manager’, Mimi De Costa, to assist in the design and construction of the ‘ideal eco friendly’ Green Roof. The roof was part of a visually stunning house building project in the beautiful village of Ulcombe in Kent. With its picturesque views and rolling landscape, Mrs De Costa designed this beautiful home from start to finish, successfully project managing the whole scheme. Accurate Roofing worked in conjunction with Bauder and Mrs De Costa, to provide a highly efficient roof system that incorporated tapered insulation and thereon a light grey single ply membrane. The low level first...

Read More

Krishna Avanti School London

Krishna Avanti School London

Accurate Roofing recently carried out in conjunction with Mansell Construction Services Ltd, a Bew build school project in Edgware. The project consisted of various flat roof areas using the Bauder BTRS system incorporating tapered insulation and various pitched ‘Green Roof’ areas. Using the same system, but installing Bauder’s successful Sedum blanket, an aesthetically pleasing visual effect was created, which by design, incorporated all of the different colours and roof shapes. The project was completed on time, within budget and quality controlled/managed, using the skills and training of our employees, to produce a product and finish of the highest...

Read More

Pines Calyx Dover

Pines Calyx Dover

The Pines Calyx is set within six acres of organically managed pine gardens situated near to the beach at St Margaret’s Bay, near Dover. Using the highly acclaimed ‘Bauder’ system, Accurate Roofing successfully tendered this project directly with the client and provided a Bio Diversity roof build up system which was ecologically brilliant in its design. The project created an enormous amount of public interest and was featured on local TV during various stages of the build process. This was a very technically involved project. Its twin merging domes were designed and produced to create a visually stunning effect that can be viewed from the park grounds at the Pines...

Read More

Pump House Olympic Stadium Stratford

Pump House Olympic Stadium Stratford

Accurate Roofing secured this prestigious project by assisting the client in getting Bauder’s ‘Bakor’ hot melt system specified by the O.D.A. (The Olympic Delivery Authority). The project was carried out in full view of the main Olympic stadium (as can be seen from the photographs). The system used was Bauder’s ‘Bakor’ hot melt rubberised bituminous monolithic membrane which provides a seamless waterproof barrier. This is reinforced with Bauder’s familiar Plant ’E’ Cap Sheet membrane which in turn provides a root barrier to the hot melt. Protection and drainage layers were then laid prior to the installation of 200 mm of Bauder’s extensive substrate....

Read More

Rolls Royce Assembly Plant Chichester

Rolls Royce Assembly Plant Chichester

When part of the enormous roof over the main assembly plant at Rolls Royce failed, Accurate Roofing was called in to inspect and provide a condition survey. Working alongside ‘Alumasc’, a roofing material specialist, a specification was devised and submitted which suggested removing the existing Bio Diversity roof covering without removing hundreds of tonnes of material from the roof, thus saving thousands of pounds and shortening the work programme. Our solution was readily accepted. The roof was broken down into eight 320 sq. m sections and re-waterproofed with a single layer of ‘Alumasc’s’ Derbigum system. An anti root barrier was...

Read More

Savoy Hotel London

Savoy Hotel London

Accurate Roofing secured a hugely prestigious project through the Chorus group who undertook the £200 million refurbishment of the Sovoy Hotel London. Accurate Roofing’s brief was to provide a cost effective upgrade system to the existing asphalt roof covering using ‘Alumasc’s’ highly acclaimed Derbigum system that has been used for many years to refurbish existing asphalt roof coverings. The main South Block roof and roofs above the Reading Room and Beaufort Lightwell were overlaid with a 2 layer Derbigum system to replicate the existing finish. Awkward plant details to various other areas around the site were successfully detailed using Alumasc’s...

Read More

St Pauls Academy London

St Pauls Academy London

Accurate Roofing secured this 5,500 sq m project with a competitive tender in the face of stiff opposition from rival companies. Winning the contract endorsed our position in the market as an ‘Accredited Supply Chain Company’. Again, using Bauder’s ‘Bakor’hot melt system, we were able to provide a very quick and highly effective waterproof membrane to the concrete and lightweight ply/metal deck roof structure. The coverings were then insulated with inverted roof insulation and ballasted with pebbles and paving slab walkways. Due to its stunning visual effect, short work programme and competitive cost, Accurate Roofing is pleased to announce it has have...

Read More

University Campus Suffolk

University Campus Suffolk

Accurate Roofing carried out the above project for Willmott Dixon again using the Bauder ‘Total Green’ roof system. The project was constructed on a 20 degree roof slope starting at floor level 8 and spiralling down to floor level 3, with a requirement for 200 mm insulation to be installed upon the roof. Accurate Roofing designed and supplied a suitable bracket system to secure 200mm thick timbers in place at 5m centres all the way up the roof slope, so as to create a ‘picture frame’ effect to retain the 200 mm insulation on the 20 degree slope. The familiar Bauder membrane system was then installed above the insulation and finally their highly acclaimed...

Read More